-->

Saturday, May 23, 2009

Construction on Clarendon Center continues

Its very quiet in Arlington right now, as most folks have either gone out of town for the Memorial Day holiday or are visiting the monuments in DC.

Construction is at a steady pace at the tri-building Clarendon Center. Both lots on either side of Clarendon Blvd are simultaneously being worked on. The pic on the right is of the north side lot behind Hard Times, which is still a hole in the ground. The south lot project is up to ground level now, prompting the builders to construct a covered wood walkway for pedestrian saftety.

Monster Band is playing at Whitlow's tonight, and Last Train Home is showcasing at Iota for the second night in a row. Although I'm not expecting many to be out enjoying the warm and humid nightlife tonight.